← Back to browse

Flowline

AI that plans your day around your actual time. Native on iPhone and macOS. Free to start.

Productivity

Added April 7, 2026 · Last analysed April 10, 2026 · via

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 10 April 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

Flowline has the basics covered well, with complete legal pages and a thorough launch checklist. Visible gaps: missing several security headers, no sitemap, and incomplete email security.

Launched on Product Hunt on April 7, 2026. The site is served through Cloudflare, with a domain registered 2 weeks before launch. Our crawler found 6 technologies on this site, covering CDN, DNS providers, transactional email, and web fonts. The stack includes Cloudflare, Cloudflare DNS, and Google Fonts.

If you own this site, refresh the snapshot and see the full fix list any time →

6.7
StackScope Score
Good
88/100 Launch Readiness
Launch ready
3/3 Legal
Complete
1/2 Crawl files
Partial
Vibe Score 95 · Strong AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (6)

Infrastructure
CDN Cloudflare (3)
DNS Cloudflare DNS
Protocol HTTP/3 (2)
Email
Transactional email Resend
Build & Framework
Font Google Fonts
Analytics & Marketing
SEO Google Search Console

Infrastructure

Network
AS13335 · US
DNS
Cloudflare DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Green hosted
Host runs on renewable energy. Data from The Green Web Foundation.
SSL Certificate
Google Trust Services
Valid 20 Mar 2026 to 18 Jun 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
5 months
Registered Mar 2026 · NameCheap, Inc.

Email Security

SPF Not published. Your domain can be spoofed in phishing emails.
DKIM Detected via known email provider
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Twitter card meta tags
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
Meta description is 192 characters (advisory) Google only shows about 155–160 characters of the description in desktop search results (less on mobile); anything past that won't appear.
- Canonical URL declared

Vibe Score Breakdown How?

SignalPoints
AI copy signals +5
AI onboarding signals +5
AI palette signals +5
AI writing signals +5
AI code-structure signals +5
Recognised AI builder signature +30
AI layout signals +5
AI CSS signals +15

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

Blocks AI crawlers
llms.txt published
9 AI bots blocked in robots.txt
ai-train = no
search = yes
? ai-input (not declared)
? None advertised

Well-Known Files

robots.txt
sitemap.xml
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy.html
Terms of Service
/terms.html
82% unique

Security Headers (2/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Performance

256ms response time
Faster than 53% of sites
2 third-party domains loaded

Build

1 JS files
2 CSS files
2 Third-party domains

Brand Colours

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.