← Back to browse

Timeline & Project Planner

Instantly convert an Excel task list into an automated, interactive Gantt chart. Includes holiday calendars, task dependencies, and custom layout styling.

Productivity

Added August 18, 2026 · Last analysed August 18, 2026 · via

StackScope is a free public catalogue of indie launches. We find launches on Product Hunt, Hacker News and similar feeds, then crawl each site to detect its tech stack and score it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 18 August 2026; the live site may have changed since.

Timeline & Project Planner is partway there, with a thorough launch checklist. Worth fixing first: missing several security headers, incomplete legal pages, and no robots.txt or sitemap.

Launched on Product Hunt on August 18, 2026. The site is hosted on Microsoft Corporation in the United States, with a domain registered in 2012. The crawl picked up 8 technologies on this site, covering backend framework, CSS frameworks, DNS providers, and business email. The stack includes Bootstrap, ASP.NET, and Google Search Console.

For context, it's running the same core stack as 524 other launches.

If you own this site, refresh the snapshot and see the full fix list any time →

Vibe Score 5 · Few AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (8)

Infrastructure
DNS Namecheap DNS
Security HSTS
Server Microsoft IIS
Email
Business email PrivateEmail (2)
Build & Framework
CSS framework Bootstrap (3)
Package CDN jsDelivr (2)
Analytics & Marketing
SEO Google Search Console
Other
Backend framework ASP.NET

Infrastructure

DNS
Namecheap DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
DigiCert Inc
Valid 12 Jun 2026 to 12 Dec 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
14.2 years
Registered Jun 2012 · NameCheap, Inc.

Email Security

SPF ~all Soft-fail (~all). Common and accepted.
?
DKIM Not detected at common selectors. Your provider may use a custom one.
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (0)

This site uses no client-side storage we could detect on page load.

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
- Twitter card meta tags

Performance How?

569 ms Server response
27% Faster than peers
728 ms Largest contentful paint
0.00 Cumulative layout shift
151 KB Page weight
66 KB Image weight
2 Third-party domains
0 Console errors
0 Failed requests

5 images: 5 without width/height

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
AI writing signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy
? Terms of Service not detected
Shared by 2 other sites (identical text)
0% unique

Security Headers (1/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
4 JS files
2 CSS files
2 Third-party domains

Brand Colours

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.