Terminplaner Digital

Die moderne DSGVO-konforme Lösung für Online-Terminbuchung. 14 Tage kostenlos testen!

Productivity
Germany Estimated origin: Germany

Added April 20, 2026 · Last analysed April 20, 2026 · via

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 20 April 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

Terminplaner Digital covers some of the launch checklist, with a thorough launch checklist. Main gaps: missing several security headers, incomplete legal pages, and no sitemap.

Launched on Product Hunt on April 20, 2026. The site is hosted on Hostinger in Lithuania. Our crawler found 7 technologies on this site, covering AI builders, CSS frameworks, developer tools, and DNS providers. The stack includes Tailwind CSS, INWX, and Lovable.

It's also on one of the most common stacks we track, shared by 7,740 launches.

If you own this site, refresh the snapshot and see the full fix list any time →

5.1
StackScope Score
Fair
90/100 Launch Readiness
Launch ready
0/3 Legal
Missing
1/2 Crawl files
Partial
Vibe Score 100 · Strong AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (7)

Infrastructure
DNS INWX
OS Ubuntu (2)
Server nginx (2)
Build & Framework
CSS framework Tailwind CSS
Developer tools Vite
UI library shadcn/ui
AI & Emerging
AI builder Lovable

Infrastructure

Network
AS47583 · LT
DNS
INWX
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Green hosted
Host runs on renewable energy. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 13 Mar 2026 to 11 Jun 2026
Certificate as captured in this snapshot, not a live check.

Email Security

SPF Not published. Your domain can be spoofed in phishing emails.
?
DKIM Not detected at common selectors. Your provider may use a custom one.
DMARC Not published. Receivers fall back to permissive defaults.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description) (partial) missing og:image
Twitter card meta tags
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)

Vibe Score Breakdown How?

SignalPoints
AI palette signals +5
Recognised AI builder signature +100
Default scaffold favicon +10

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml
security.txt
llms.txt
ads.txt
humans.txt
? Privacy Policy not detected
? Terms of Service not detected
Detection works best on English language sites.

Security Headers (3/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Performance

691ms response time
Faster than 21% of sites
1 third-party domains loaded

Build

1 JS files
1 CSS files
1 Third-party domains
Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.