Radiobench
Native desktop SDR workspace for HF operators on macOS, Windows, and Linux. Free 14-day trial built in.
StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 3 September 2026; the live site may have changed since.
Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.
Radiobench looks production-ready overall, with complete legal pages, well-configured email security, and clean crawl signals. Worth fixing first: missing several security headers.
Launched on Hacker News on September 3, 2026. The site is served through Cloudflare, with a domain registered 5 months before launch. We've detected 12 technologies on this site, covering analytics, payments, CDN, and DNS providers. The stack includes Next.js, React, and Cloudflare.
It's running the same core stack as 1,294 other launches.
If you own this site, refresh the snapshot and see the full fix list any time →
Tech Stack (12)
| CDN |
|
| DNS |
|
| Protocol | HTTP/3 |
| Security |
|
| Email forwarding |
|
| Transactional email |
|
| Analytics |
|
|
|
| Payments |
|
|
|
Infrastructure
Email Security
Storage (1)
| Name | Lifetime | Detected as |
|---|---|---|
| __cf_bm | < 1h | Cloudflare |
Readiness Breakdown How?
Performance How?
⚠ 1 images: 1 oversized
Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.
Vibe Score Breakdown How?
| Signal | Points |
|---|---|
| AI palette signals | +5 |
| AI writing signals | +5 |
This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.