← Back to browse

Maverick Project Scheduler

AI-powered cloud project scheduling trusted by teams in 20+ countries. Gantt charts, resource management, and LLM-assisted planning — all in one platform.

Productivity
United States Estimated origin: United States

Added May 20, 2026 · Last analysed May 20, 2026 · via PeerPush

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 20 May 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

Maverick Project Scheduler ships with the launch fundamentals in place, with a thorough launch checklist and clean crawl signals. What needs work: no Content-Security-Policy, incomplete legal pages, and tracking cookies set before any opt-in.

Launched on PeerPush on May 20, 2026. The site is hosted on NETWORK TRANSIT HOLDINGS LLC in the United States, with a domain registered 3 weeks before launch. The crawl picked up 6 technologies on this site, covering analytics, DNS providers, icon font, and package cdn. The stack includes cdnjs, CyberBasement DNS, and Font Awesome.

For context, it's tighter on security headers than most PeerPush launches.

If you own this site, refresh the snapshot and see the full fix list any time →

8.4
StackScope Score
Excellent
94/100 Launch Readiness
Launch ready
2/3 Legal
Partial
2/2 Crawl files
Complete
Vibe Score 43 · Some AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (6)

Infrastructure
DNS CyberBasement DNS
Security HSTS
Build & Framework
Icon font Font Awesome
Package CDN cdnjs
Analytics & Marketing
Analytics Google Analytics (3)
SEO Google Search Console

Infrastructure

DNS
CyberBasement DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
DigiCert Inc
Valid 1 May 2026 to 15 Nov 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
4 months
Registered Apr 2026 · Network Solutions, LLC

Email Security

SPF ~all Soft-fail (~all). Common and accepted.
?
DKIM Not detected at common selectors. Your provider may use a custom one.
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (2)

Cookies (2)
NameLifetimeDetected as
_ga 1y Google Analytics
_ga_L9NF5PLHQM 1y Google Analytics

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
- Twitter card meta tags

Vibe Score Breakdown How?

SignalPoints
AI copy signals +5
AI writing signals +3
AI code-structure signals +10
AI layout signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml (64 URLs)
security.txt
llms.txt
ads.txt
humans.txt
? Privacy Policy not detected
Terms of Service
/terms-and-conditions
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.

Security Headers (5/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Performance

736ms response time
Faster than 18% of sites
5 third-party domains loaded

Build

2 JS files
7 CSS files
5 Third-party domains
Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.