← Back to browse

ExtravaGantt

Beautiful project timelines without the complexity or per-seat pricing.

Productivity

Added April 17, 2026 · Last analysed April 17, 2026 · via

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 17 April 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

ExtravaGantt is largely in shape, with complete legal pages, a thorough launch checklist, and clean crawl signals. What needs work: missing several security headers, tracking cookies set before any opt-in, and incomplete email security.

Launched on Product Hunt on April 17, 2026. The site is hosted on Vercel, with a domain registered 3 months before launch. The crawl picked up 11 technologies on this site, covering analytics, CSS frameworks, developer tools, and DNS providers. The stack includes Tailwind CSS, GoDaddy DNS, and Google Analytics.

For context, it's running the same core stack as 3,366 other launches.

If you own this site, refresh the snapshot and see the full fix list any time →

7.6
StackScope Score
Good
100/100 Launch Readiness
Launch ready
3/3* Legal
Complete*
2/2 Crawl files
Complete
Vibe Score 20 · Few AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (11) · Indie stack

Infrastructure
DNS GoDaddy DNS
Hosting Vercel (2)
Security HSTS (2)
Email
Email forwarding ImprovMX
Transactional email Resend
Build & Framework
CSS framework Tailwind CSS
Developer tools Vite
Font Google Fonts
UI library shadcn/ui
Analytics & Marketing
Analytics Google Analytics (2)
SEO Google Search Console

Infrastructure

Network
AS16509 · US
DNS
GoDaddy DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 14 Apr 2026 to 13 Jul 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
8 months
Registered Jan 2026 · GoDaddy.com, LLC

Email Security

SPF Not published. Your domain can be spoofed in phishing emails.
DKIM Detected via known email provider
DMARC p=quarantine Quarantine (moderate)
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Twitter card meta tags
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)

Vibe Score Breakdown How?

SignalPoints
AI copy signals +5
AI palette signals +5
AI writing signals +5
AI layout signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml (6 URLs)
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy
Terms of Service
/terms
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
78% unique

Security Headers (1/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Performance

187ms response time
Faster than 69% of sites
4 third-party domains loaded

Build

2 JS files
2 CSS files
4 Third-party domains
Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.