GanttPilot

Create editable project schedules from prompts, templates, Excel, Project XML, or MPP files. Check dependencies, resources, and revision impact.

Productivity

Added July 22, 2026 · Last analysed July 22, 2026 · via · 71% unique tagline

StackScope is a free public catalogue of indie launches. We find launches on Product Hunt, Hacker News and similar feeds, then crawl each site to detect its tech stack and score it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 22 July 2026; the live site may have changed since.

GanttPilot looks production-ready overall, with complete legal pages, a thorough launch checklist, and clean crawl signals. Visible gaps: missing several security headers, tracking cookies set before any opt-in, and incomplete email security.

Launched on Product Hunt on July 22, 2026. The site is hosted on Vercel, with a domain registered 4 weeks before launch. We've detected 13 technologies on this site, covering analytics, DNS providers, email forwarding, and transactional email. The stack includes Next.js, React, and Ahrefs.

It's on one of the most common stacks we track, shared by 2,463 launches.

If you own this site, refresh the snapshot and see the full fix list any time →

Vibe Score 13 · Few AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (13) · Indie stack

Infrastructure
DNS Cloudflare DNS
Hosting Vercel
Security HSTS
Email
Email forwarding Cloudflare Email Routing (2)
Transactional email Resend
Build & Framework
Framework React
Meta-framework Next.js (5)
UI library Lucide Icons
Analytics & Marketing
Analytics Ahrefs
Google Analytics (4)
Microsoft Clarity (2)
SEO Google Search Console
Tag management Google Tag Manager medium

Infrastructure

Network
AS16509 · US
DNS
Cloudflare DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 21 Jun 2026 to 19 Sep 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
1 month
Registered Jun 2026 · Cloudflare, Inc.

Email Security

SPF ~all Soft-fail (~all). Common and accepted.
DKIM Detected via known email provider
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (2)

Cookies (2)
NameLifetimeDetected as
_ga 1y Google Analytics
_ga_5VG0S99NKK 1y Google Analytics

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Twitter card meta tags
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)

Performance How?

999 ms Server response
11% Faster than peers
752 ms Largest contentful paint
0.00 Cumulative layout shift
3.1 MB Page weight
131 KB Image weight
5 Third-party domains
0 Console errors
0 Failed requests

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
AI onboarding signals +5
AI palette signals +5
AI writing signals +3

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml (50 URLs)
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy
Terms of Service
/terms
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
86% unique

Security Headers (1/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
18 JS files
2 CSS files
5 Third-party domains

Brand Colours

App Manifest

GanttPilot
display: standalone 2 icons
theme #172033
Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.