← Back to browse

GANTT360°

Build beautiful GANTT charts in your browser. Drillable phases, editable .pptx export, AI analysis, shareable links. Think-cell quality at 1/4 the price.

Productivity
Austria Estimated origin: Austria

Added August 22, 2026 · Last analysed August 22, 2026 · via

StackScope is a free public catalogue of indie launches. We find launches on Product Hunt, Hacker News and similar feeds, then crawl each site to detect its tech stack and score it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 22 August 2026; the live site may have changed since.

GANTT360° ships with the launch fundamentals in place, with complete legal pages, a complete set of security headers, and a thorough launch checklist. Worth fixing first: tracking cookies set before any opt-in and incomplete email security.

Launched on Product Hunt on August 22, 2026. The site is hosted on Vercel, with a domain registered 4 months before launch. The crawl picked up 10 technologies on this site, covering analytics, DNS providers, transactional email, and error tracking. The stack includes Next.js, React, and Google Analytics.

For context, it's running the same core stack as 3,117 other launches and tighter on security headers than most Product Hunt launches.

If you own this site, refresh the snapshot and see the full fix list any time →

10.0
StackScope Score
Excellent
100/100 Launch Readiness
Launch ready
3/3* Legal
Complete*
2/2 Crawl files
Complete
Vibe Score 45 · Some AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (10) · Indie stack

Infrastructure
DNS World4You
Hosting Vercel
Security HSTS
Email
Transactional email Resend
Build & Framework
Framework React
Meta-framework Next.js (4)
Analytics & Marketing
Analytics Google Analytics (4)
Vercel Analytics medium
Tag management Google Tag Manager (3)
Business Tools
Error tracking Sentry

Infrastructure

Network
AS16509 · US
DNS
World4You
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 6 Aug 2026 to 4 Nov 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
4 months
Registered Apr 2026 · World4You Internet Services GmbH

Email Security

SPF Not published. Your domain can be spoofed in phishing emails.
DKIM Detected via known email provider
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (2)

Cookies (2)
NameLifetimeDetected as
_ga 1y Google Analytics
_ga_0XJN7VZH4S 1y Google Analytics

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Twitter card meta tags
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
Meta description is 229 characters (advisory) Google only shows about 155–160 characters of the description in desktop search results (less on mobile); anything past that won't appear.

Performance How?

886 ms Server response
13% Faster than peers
1308 ms Largest contentful paint
0.00 Cumulative layout shift
3.9 MB Page weight
85 KB Image weight
3 Third-party domains
0 Console errors
0 Failed requests

1 images: 1 oversized

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
Placeholder branding +10
AI copy signals +5
AI onboarding signals +5
AI writing signals +5
AI layout signals +5
AI CSS signals +15

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

Welcomes AI crawlers
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml (34 URLs)
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy
Terms of Service
/terms
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
88% unique

Security Headers (6/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
15 JS files
1 CSS files
3 Third-party domains

Brand Colours

App Manifest

GANTT360°
display: standalone 1 icon
theme #00843D
Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.