We're live on Product Hunt. If you have found StackScope useful, a comment would mean a lot. See the launch

← All technologies

Sites using Avalara CertCapture

Sales tax exemption certificate management.

#7 of 85 in Compliance Tracked since Apr 2026 Last seen: Aug 31, 2026 Website: certcapture.com
Stackdar alerts

Get told when a new site ships with Avalara CertCapture.

Stackdar watches every launch we detect and sends you the ones using Avalara CertCapture, by email, Slack or webhook. On every plan, from £15 a month.

See how alerts work

70 sites

29 found by StackScope, 41 via launch platforms

StackScope Wider Web 26 StackScope Discovery (Indie) 3 Product Hunt 41
  • StackScope Wider Web 26
  • StackScope Discovery (Indie) 3
  • Product Hunt 41
Last 7 days 0.0% +0.0pp
Most used with Cloudflare, PHP, Google Analytics
Top product types Developer Tools, Marketing, Productivity
Green hosting 100% vs 45% avg

Avalara CertCapture has been detected on 70 launches we've crawled. The 7-day rolling share is 0.0%, roughly steady week on week. Most recent detection: Bloomlead — Find local businesses that need a better website, yesterday.

It's most commonly paired with Cloudflare, PHP, and Google Analytics. By product type, the launches using it are most often Developer Tools (27%), Marketing (14%), and Productivity (14%). By domain ending, launches using it are 1.9 times as likely as the average launch to live on a .com domain.

What kind of products ship with Avalara CertCapture

37 launches

Marketing
13.51%
Productivity
13.51%
AI
10.81%
Content
10.81%
Finance
8.11%
Design
5.41%
Hiring & HR
5.41%
Education
2.70%
Games
2.70%

Domain endings using Avalara CertCapture

70 sites

  • .com 78.57%
  • .store 10.00%
  • .co 4.29%
  • .online 4.29%
  • .app 1.43%
  • .ca 1.43%

Share of new sites using Avalara CertCapture

Each dot is one launch day. Line is the 7-day rolling average; weekly averages before June 2026.

0.0%
last 7 days
+0.0pp vs prior week
70
sites all time
since Apr 2026
Avalara CertCapture daily detection trend Before 8 July 2026: launch platforms only. We began crawling the wider web on this date, so the cohort this share is measured against changes here. 5% 2% 0% Apr May Jun Jul Aug Weekly averages before this point, daily after. Jun 3 · 0 / 714 = 0.0% Jun 4 · 1 / 599 = 0.2% Jun 5 · 0 / 581 = 0.0% Jun 6 · 1 / 436 = 0.2% Jun 7 · 1 / 404 = 0.2% Jun 8 · 1 / 515 = 0.2% Jun 9 · 1 / 876 = 0.1% Jun 10 · 0 / 722 = 0.0% Jun 11 · 0 / 577 = 0.0% Jun 12 · 0 / 449 = 0.0% Jun 13 · 0 / 380 = 0.0% Jun 14 · 2 / 345 = 0.6% Jun 15 · 0 / 532 = 0.0% Jun 16 · 0 / 1052 = 0.0% Jun 17 · 1 / 907 = 0.1% Jun 18 · 0 / 674 = 0.0% Jun 19 · 0 / 547 = 0.0% Jun 20 · 0 / 443 = 0.0% Jun 21 · 0 / 383 = 0.0% Jun 22 · 0 / 576 = 0.0% Jun 23 · 1 / 900 = 0.1% Jun 24 · 0 / 737 = 0.0% Jun 25 · 0 / 618 = 0.0% Jun 26 · 0 / 534 = 0.0% Jun 27 · 0 / 431 = 0.0% Jun 28 · 0 / 383 = 0.0% Jun 29 · 0 / 503 = 0.0% Jun 30 · 0 / 801 = 0.0% Jul 1 · 0 / 795 = 0.0% Jul 2 · 0 / 604 = 0.0% Jul 3 · 0 / 499 = 0.0% Jul 4 · 0 / 411 = 0.0% Jul 5 · 0 / 367 = 0.0% Jul 6 · 0 / 551 = 0.0% Jul 7 · 0 / 1171 = 0.0% Jul 8 · 1 / 12590 = 0.0% Jul 9 · 1 / 23745 = 0.0% Jul 10 · 0 / 22552 = 0.0% Jul 11 · 0 / 15979 = 0.0% Jul 12 · 0 / 20291 = 0.0% Jul 13 · 1 / 20923 = 0.0% Jul 14 · 0 / 20408 = 0.0% Jul 15 · 1 / 17242 = 0.0% Jul 16 · 1 / 14264 = 0.0% Jul 17 · 0 / 19732 = 0.0% Jul 18 · 2 / 22700 = 0.0% Jul 19 · 0 / 26074 = 0.0% Jul 20 · 1 / 22585 = 0.0% Jul 21 · 2 / 21649 = 0.0% Jul 22 · 1 / 23202 = 0.0% Jul 23 · 0 / 16863 = 0.0% Jul 24 · 0 / 12855 = 0.0% Jul 25 · 0 / 8947 = 0.0% Jul 26 · 0 / 19978 = 0.0% Jul 27 · 0 / 33868 = 0.0% Jul 28 · 2 / 38221 = 0.0% Jul 29 · 0 / 50105 = 0.0% Jul 30 · 1 / 43953 = 0.0% Jul 31 · 1 / 51110 = 0.0% Aug 1 · 0 / 50488 = 0.0% Aug 2 · 0 / 49662 = 0.0% Aug 3 · 1 / 48190 = 0.0% Aug 4 · 0 / 37326 = 0.0% Aug 5 · 0 / 32706 = 0.0% Aug 6 · 0 / 36581 = 0.0% Aug 7 · 1 / 37889 = 0.0% Aug 8 · 1 / 39682 = 0.0% Aug 9 · 1 / 34205 = 0.0% Aug 10 · 1 / 28848 = 0.0% Aug 11 · 1 / 32021 = 0.0% Aug 12 · 3 / 33479 = 0.0% Aug 13 · 1 / 49914 = 0.0% Aug 14 · 1 / 51430 = 0.0% Aug 15 · 0 / 51492 = 0.0% Aug 16 · 0 / 51814 = 0.0% Aug 17 · 0 / 41418 = 0.0% Aug 18 · 2 / 53844 = 0.0% Aug 19 · 0 / 49416 = 0.0% Aug 20 · 1 / 66833 = 0.0% Aug 21 · 1 / 90359 = 0.0% Aug 22 · 1 / 91515 = 0.0% Aug 23 · 0 / 90229 = 0.0% Aug 24 · 0 / 78860 = 0.0% Aug 25 · 0 / 69248 = 0.0% Aug 26 · 1 / 65059 = 0.0% Aug 27 · 1 / 83368 = 0.0% Aug 28 · 0 / 83321 = 0.0% Aug 29 · 1 / 84164 = 0.0% Aug 30 · 2 / 92097 = 0.0% Aug 31 · 2 / 88763 = 0.0%
Mar 30, 2026 90 days Aug 31, 2026

The shaded part of the chart is measured against a different set of sites. Until 8 July 2026 we only tracked launches from launch platforms; from that date we crawl the wider web as well. The share is a proportion of whatever we were tracking at the time, so it can step at that line without the technology itself changing. For a single continuous measure, switch to launch platforms.

How StackScope detects technologies

Compliance leaders

Tool % of launches % of category
#1 DMCA.com 0.02% 30.35%
#2 ActiveProspect 0.01% 19.85%
#3 ICP Beian 0.01% 8.32%
#4 ▲1 ANPC SAL <0.01% 6.88%
#5 ▼2 Bộ Công Thương <0.01% 4.93%
#7 ▼4 Avalara CertCapture Current page <0.01% 4.02%

Percentages show adoption among indie launches: the share of all analysed launches, and of launches using any Compliance tool.Among August launches it ranked #10 in Compliance, down from #6 in July. All 85 in Compliance →

Often used with

Tool Launches
Cloudflare 41
PHP 41
Google Analytics 41
Intercom 41
Sentry 41

Tools most often detected on the same launches as Avalara CertCapture.

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.