← Back to browse

Simple Gantt

Visual project planning made simple

Productivity
Poland Estimated origin: Poland

Added July 2, 2026 · Last analysed July 2, 2026 · via

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 2 July 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

Simple Gantt still has work before launch. What needs work: missing several security headers, incomplete legal pages, and no robots.txt or sitemap.

Launched on Product Hunt on July 2, 2026. The site is hosted on Vercel, with a domain registered 6 weeks before launch. The crawl picked up 12 technologies on this site, covering analytics, advertising, CSS frameworks, and DNS providers. The stack includes Next.js, React, and Tailwind CSS.

For context, it's running the same core stack as 14,977 other launches.

If you own this site, refresh the snapshot and see the full fix list any time →

Vibe Score 10 · Few AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (12)

Infrastructure
DNS home.pl
Hosting Vercel
Security HSTS
Email
Business email home.pl Email
Build & Framework
CSS framework Tailwind CSS
Framework React
Meta-framework Next.js (5)
UI library Lucide Icons
Analytics & Marketing
Advertising Google Ads (3)
Analytics Google Analytics (3)
PostHog (5)
Tag management Google Tag Manager (3)

Infrastructure

Network
AS16509 · US
DNS
home.pl
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 14 May 2026 to 12 Aug 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
3 months
Registered May 2026 · Key-Systems GmbH

Email Security

SPF ~all Soft-fail (~all). Common and accepted.
?
DKIM Not detected at common selectors. Your provider may use a custom one.
DMARC Not published. Receivers fall back to permissive defaults.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (7)

Cookies (2)
NameLifetimeDetected as
ph_phc_mA2THdM7AbK4fWCEfHz6QeTwcvBu6Ze29ci4csvcos2Y_posthog 12mo PostHog
_gcl_au 2mo Google Ads
Local storage (2)
KeySizeDetected as
ph_phc_mA2THdM7AbK4fWCEfHz6QeTwcvBu6Ze29ci4csvcos2Y_posthog 1.6 KB PostHog
_gcl_ls 277 B Google Ads
Session storage (3)
KeySizeDetected as
ph_phc_mA2THdM7AbK4fWCEfHz6QeTwcvBu6Ze29ci4csvcos2Y_posthog 299 B PostHog
ph_phc_mA2THdM7AbK4fWCEfHz6QeTwcvBu6Ze29ci4csvcos2Y_primary_window_exists 4 B PostHog
ph_phc_mA2THdM7AbK4fWCEfHz6QeTwcvBu6Ze29ci4csvcos2Y_window_id 38 B PostHog

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description) (partial) missing og:image
Twitter card meta tags
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
- Canonical URL declared

Performance How?

315 ms Server response
48% Faster than peers
624 ms Largest contentful paint
0.00 Cumulative layout shift
2.0 MB Page weight
1.4 MB Image weight
2 Third-party domains
0 Console errors
0 Failed requests

6 images: 6 oversized, 6 without width/height

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
AI copy signals +5
AI writing signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

No AI stance declared
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy
? Terms of Service not detected
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
86% unique

Security Headers (1/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
21 JS files
1 CSS files
2 Third-party domains

Brand Colours

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.