Google framework that tells Analytics, Ads and Tag Manager tags whether a visitor has consented, so they adjust what they collect.
4,505 sites
70 found by StackScope, 4,435 via launch platforms
- StackScope Wider Web 57
- StackScope Discovery (Indie) 13
- Product Hunt 3,268
- Other 555
- PeerPush 446
- Hacker News 166
Google appeared on about 1,000 new sites in the last 30 days.
These figures cover websites that went live since April 2026, not the web as a whole.
Get told when a new site ships with Google.
1,022 new sites with Google first seen in the last 30 days.
Stackdar watches every launch we detect and sends you the ones using Google, by email, Slack or webhook. On every plan, from £15 a month.
See how alerts workShare of new sites using Google
Each dot is one launch day. Line is the 7-day rolling average; weekly averages before July 2026.
The shaded areas were measured against a different set of sites, so the line can step there without Google itself changing.
Coverage details
Before the dashed line where the dots begin, the line is a weekly average. After it, the last 90 days are shown one day at a time.
Grey: before 8 July 2026, we only tracked launches from launch platforms. From that date we crawl the wider web as well.
Amber: 8 July to 10 September 2026, before we improved our infrastructure to index new sites much sooner, often on the day they go live. Sites found that early often haven't finished setting up, so anything usually added after launch reads lower from 10 September. We record each site as it was when we found it.
The share is a proportion of whatever we were tracking at the time. For a single continuous measure, switch to launch platforms.
What kind of sites use Google
2,979 sites with a known type, all time
Domain endings using Google
4,505 sites, all time
- .com 52.9%
- .ai 8.2%
- .app 7.3%
- .io 5.6%
- .net 2.3%
- .co 1.7%
- .in 1.5%
- .org 1.5%
- .uk 1.4%
- .dev 1.2%
- .de 0.9%
- .pro 0.8%
- .fr 0.7%
- .me 0.6%
- .online 0.6%
Country
Country known for 1,386 of 4,505 sites (30.8%), all time.
How we know
Country comes from what each site says about itself, such as a company registration, legal terms or a phone number, not just its domain ending. We count a country only where it is stated plainly enough to be sure: a governing-law clause or company registration number on a legal page, a phone country code, or a country domain ending. Sites that publish none are not counted at all.
-
United States 23.6%
-
United Kingdom 13.3%
-
India 11.3%
-
Canada 3.5%
-
Spain 3.4%
-
Australia 3.3%
-
Germany 3.3%
-
France 2.5%
-
United Arab Emirates 2.4%
-
Brazil 2.2%
-
Netherlands 2.0%
-
Poland 1.9%
-
Romania 1.4%
-
Estonia 1.3%
-
Israel 1.2%
Green hosting
4,434 checked sites since Apr 2026.
What this means
The share whose web host The Green Web Foundation lists as running on green energy, against the average for every new site we checked.
- Google 55%
- Average 47%
Consent leaders
| Tool | % of sitesall time | % of categoryall time | ||
|---|---|---|---|---|
| #1 | ▲1 |
|
0.3% | 19.2% |
| #2 | ▼3 |
|
0.3% | 19.1% |
| #3 | ▲1 |
|
0.3% | 16.4% |
| #4 | ▲3 |
|
0.2% | 11.8% |
| #5 | ▼1 |
|
0.2% | 9.2% |
| … | ||||
| #8 | ▼2 |
|
0.1% | 4.6% |
Percentages show all-time adoption across the new sites we track: the share of all of them, and of the sites using any Consent tool.Among September launches it ranked #10 in Consent, down from #8 in August. All 382 in Consent →
Recent launches using Google
4,448 of the 4,505 sites using Google are product launches we list individually. The other 57 are sites we found crawling the wider web: they count towards the figures above, but we do not publish them one by one. They are included in the StackScope API and in Stackdar alerts. How StackScope Discovery works
Best Song Gift
Also detected
SkilledJobs
Also detected
ReportFalcon
Also detected
AppyShift
Also detected
LocalUsta
Also detected
Zombie Couple Video
Also detected
Simple Financial Tools
Also detected
keinsaas
Also detected
KanaCraft English
Also detected
Ringo
Also detected
Immimaps
Also detected
Yodoya
Also detected
Showing the most recent 12 of 4,448.
The StackScope API serves all 4,505 sites using Google, filterable and exportable, from £15 a month.