New: The State of Indie Launches: July 2026. The framework layer is the same everywhere. The payment layer is not. Read

← Back to browse

Primavera course | Primavera p6 course

Advance your project management skills with our certified Primavera P6 course in Dubai. Learn Primavera software with hands-on training covering all aspects from planning a project to its execution. Join our expert-led sessions today!

Education
United Arab Emirates Estimated origin: United Arab Emirates

Added August 13, 2026 · Last analysed August 13, 2026 · via

StackScope is a free public catalogue of indie launches. We find launches on Product Hunt, Hacker News and similar feeds, then crawl each site to detect its tech stack and score it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 13 August 2026; the live site may have changed since.

Primavera course | Primavera p6 course ships with the launch fundamentals in place, with complete legal pages, a thorough launch checklist, and fast page loads. What needs work: no Strict-Transport-Security, tracking cookies set before any opt-in, and incomplete email security.

Launched on Product Hunt on August 13, 2026. The site is served through Cloudflare, with a domain registered in 2015. Our crawler found 19 technologies on this site, covering advertising, analytics, javascript library, and captcha. The stack includes Vue.js, cdnjs, and Cloudflare.

It's also running the same core stack as 311 other launches and tighter on security headers than most Product Hunt launches.

If you own this site, refresh the snapshot and see the full fix list any time →

9.5
StackScope Score
Excellent
100/100 Launch Readiness
Launch ready
3/3* Legal
Complete*
2/2 Crawl files
Complete
Vibe Score 30 · Some AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (19)

Infrastructure
CDN Cloudflare (3)
DNS Cloudflare DNS
Security Cloudflare Bot Management
Server PHP
Email
Business email Microsoft 365
Email security Proofpoint Essentials
Build & Framework
Captcha Cloudflare Turnstile
Framework Vue.js
Icon font Font Awesome
JavaScript library jQuery
PhotoSwipe
Package CDN cdnjs
Analytics & Marketing
Advertising Facebook Pixel (3)
Google Ads (2)
Analytics Google Analytics (4)
Hotjar (2)
SEO Google Search Console (2)
Tag management Google Tag Manager (4)
Business Tools
Chat JivoSite (3)

Infrastructure

Network
AS13335 · US
DNS
Cloudflare DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Green hosted
Host runs on renewable energy. Data from The Green Web Foundation.
SSL Certificate
Google Trust Services
Valid 27 Jun 2026 to 25 Sep 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
11.5 years
Registered Feb 2015 · GoDaddy.com, LLC

Email Security

SPF -all Strict (-all). Strong.
?
DKIM Not detected at common selectors. Your provider may use a custom one.
DMARC Not published. Receivers fall back to permissive defaults.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (21)

Cookies (9)
NameLifetimeDetected as
cf_clearance 12mo Cloudflare
hl 12mo -
PHPSESSID session PHP
_fbp 2mo Facebook Pixel
_ga 1y Google Analytics
_gat_gtag_UA_80711959_1 < 1h Google Analytics
_ga_R6JGC72YL5 1y Google Analytics
_gcl_au 2mo Google Ads
_gid 23h Google Analytics
Local storage (12)
KeySizeDetected as
jv_history_mqpkmuaOp3 216 B JivoSite
jv_loader_info_mqpkmuaOp3 500 B JivoSite
jv_store_mqpkmuaOp3_app 469 B JivoSite
jv_store_mqpkmuaOp3_client 873 B JivoSite
jv_sync_mqpkmuaOp3 109 B JivoSite
jv_temp_sess_enter_ts_mqpkmuaOp3 44 B JivoSite
jv_temp_sess_pages_count_mqpkmuaOp3 32 B JivoSite
jv_temp_sess_vi_presence_mqpkmuaOp3 68 B JivoSite
jv_temp_visits_count_mqpkmuaOp3 32 B JivoSite
lastExternalReferrer 5 B -
lastExternalReferrerTime 13 B -
_gcl_ls 277 B Google Ads

Readiness Breakdown How?

Custom title and meta description
Open Graph tags (title, image, description)
Twitter card meta tags
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
Page title is 85 characters (advisory) Google only shows about 60 characters of the title in search results; aim for 50–60 to keep the whole thing visible.
Meta description is 234 characters (advisory) Google only shows about 155–160 characters of the description in desktop search results (less on mobile); anything past that won't appear.

Performance How?

108 ms Server response
82% Faster than peers
1400 ms Largest contentful paint
0.12 Cumulative layout shift
1.4 MB Page weight
136 KB Image weight
8 Third-party domains
0 Console errors
0 Failed requests

10 images: 10 without width/height, 1 missing alt text

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
AI palette signals +5
AI code-structure signals +20
AI layout signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

Blocks AI crawlers
llms.txt published
9 AI bots blocked in robots.txt
ai-train = no
search = yes
? ai-input (not declared)
? None advertised

Well-Known Files

robots.txt
sitemap.xml (155 URLs)
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/privacy-policy/
Terms of Service
/refund-other-terms/
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
86% unique

Security Headers (5/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
9 JS files
3 CSS files
8 Third-party domains

Brand Colours

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.