← Back to browse

DHTMLX Gantt Community Edition

Free MIT-licensed JavaScript Gantt chart library for project timelines. Open source Gantt chart with smart rendering, drag-and-drop, and inline editing by DHTMLX.

Developer Tools

Added June 23, 2026 · Last analysed June 23, 2026 · via

StackScope records what new websites are built with, the week they launch. Most we find ourselves, by watching public internet infrastructure for brand-new sites; the rest come from Product Hunt, Hacker News and PeerPush. We crawled this one for its tech stack and scored it for launch readiness: DNS, security headers, SEO basics. This page is what we saw on 23 June 2026; the live site may have changed since.

Every technology below links to its own page: which other new sites launched with it. Vendors and agencies watch those pages with Stackdar and hear about new adopters the week they ship, from £15 a month.

DHTMLX Gantt Community Edition is largely in shape, with complete legal pages and clean crawl signals. Main gaps: missing several security headers, tracking cookies set before any opt-in, and incomplete email security.

Launched on Product Hunt on June 23, 2026. The site is hosted on DreamHost, with a domain registered in 2007. The crawl picked up 22 technologies on this site, covering javascript library, analytics, transactional email, and package cdn. The stack includes clipboard.js, DigitalOcean DNS, and DreamHost.

For context, it's one of 33 launches on this exact stack.

If you own this site, refresh the snapshot and see the full fix list any time →

Vibe Score 35 · Some AI signals
How much the site looks AI-generated. Informational pattern-match signal, not a verdict. Does not feed the StackScope Score. See which fingerprints fired →

Tech Stack (22)

Infrastructure
DNS DigitalOcean DNS
Hosting DreamHost
OS Ubuntu
Server nginx
Email
Business email Rackspace Email
Email marketing MailerLite
Transactional email MailChannels
SendGrid (2)
Build & Framework
Font Google Fonts
JavaScript library clipboard.js
jQuery (2)
Modernizr
Swiper
Package CDN Google Hosted Libraries
jsDelivr
Video YouTube
Analytics & Marketing
Advertising Google Ads (3)
Analytics Google Analytics (4)
VWO (3)
Yandex Metrica (5)
Marketing Facebook Domain Verification
Tag management Google Tag Manager (5)

Infrastructure

DNS
DigitalOcean DNS
Authoritative nameserver
DNSSEC
Not enabled
DNS responses unsigned. Cache-poisoning vulnerable.
Green hosting
Not green hosted
No green-energy record. Data from The Green Web Foundation.
SSL Certificate
Let's Encrypt
Valid 5 Jun 2026 to 3 Sep 2026
Certificate as captured in this snapshot, not a live check.
Domain Age
19.4 years
Registered Apr 2007 · DreamHost, LLC

Email Security

SPF ~all Soft-fail (~all). Common and accepted.
DKIM Detected via known email provider
DMARC p=none None (p=none). Monitoring only.
?
MTA-STS Not deployed. Mail to your domain can be downgraded to plaintext en route.
?
TLS-RPT Not configured. You won't hear about silent SMTP TLS handshake failures.

Storage (22)

Cookies (14)
NameLifetimeDetected as
bh 1y -
remote-tCDMLxiD session -
sync_cookie_csrf < 1h -
sync_cookie_csrf_secondary < 1h -
_dc_gtm_UA-11031269-1 < 1h Google Tag Manager
_ga 1y Google Analytics
_ga_N87XPB4GSG 1y Google Analytics
_gcl_au 3mo Google Ads
_gid 1d Google Analytics
_vwo_uuid_v2 1y VWO
_ym_d 1y Yandex Metrica
_ym_isad 19h Yandex Metrica
_ym_uid 1y Yandex Metrica
_ym_visorc < 1h Yandex Metrica
Local storage (7)
KeySizeDetected as
_gcl_ls 277 B Google Ads
_ym43004664:0_reqNum 1 B Yandex Metrica
_ym43004664_lsid 13 B Yandex Metrica
_ym_retryReqs 2 B Yandex Metrica
_ym_synced 16 B Yandex Metrica
_ym_uid 19 B Yandex Metrica
_ym_wv2rf:43004664:0 1 B Yandex Metrica
Session storage (1)
KeySizeDetected as
__ym_tab_guid 36 B Yandex Metrica

Readiness Breakdown How?

Custom title and meta description
Canonical URL declared
Responsive viewport meta tag
Favicon present
Semantic HTML (nav, main, article)
Page title is 63 characters (advisory) Google only shows about 60 characters of the title in search results; aim for 50–60 to keep the whole thing visible.
Meta description is 162 characters (advisory) Google only shows about 155–160 characters of the description in desktop search results (less on mobile); anything past that won't appear.
- Open Graph tags (title, image, description)
- Twitter card meta tags

Performance How?

1604 ms Server response
4% Faster than peers
2324 ms Largest contentful paint
0.04 Cumulative layout shift
4.6 MB Page weight
1.4 MB Image weight
10 Third-party domains
0 Console errors
0 Failed requests

34 images: 12 oversized, 14 without width/height, 18 missing alt text

Indicative grade from a single automated render, not a substitute for Lighthouse or field data, and not part of the StackScope score.

Vibe Score Breakdown How?

SignalPoints
AI copy signals +5
AI code-structure signals +5
AI layout signals +5

This score is based on structural patterns and is not definitive. Many legitimate sites may trigger signals, and AI-built sites may go undetected. It should be treated as an indicator, not a verdict.

AI Stance

Welcomes AI crawlers
llms.txt published
No AI bots blocked in robots.txt
? No directive declared
? None advertised

Well-Known Files

robots.txt
sitemap.xml (1111 URLs)
security.txt
llms.txt
ads.txt
humans.txt
Privacy Policy
/docs/privacy.shtml
Terms of Service
/docs/terms.shtml
? Consent manager not detected
Analytics set tracking cookies on our visit, with no opt-in step.
94% unique

Security Headers (0/6)

Permissions-Policy experimental (check browser support)
X-XSS-Protection deprecated (use Content-Security-Policy)

Build

Code splitting
18 JS files
3 CSS files
10 Third-party domains

Brand Colours

Something not look right? If a technology shown here is wrong or out of date, email [email protected] and we'll review it.